Engineering Installation Engineering Installation
Team Working Towards a Sustainable Future 01527 893880

Bosch Phase 1

Client: Bosch Thermotechnology UK Limited
End User: Bosch Thermotechnology UK Limited
Project Description: New build extension incorporating offices, call centre, conference facilities, central ‘energy’ atrium and new central plant.
Services Provided by ESDP: Mechanical and Electrical Full Design and Site Monitoring Services
Design Features: The new central plant provided for the extension was designed and sized to serve existing heating, ventilation, cooling and domestic water circuits for the existing office building as well as the new extension. New central plant included high efficiency boilers and heat recovery ventilation systems. The electrical services included low energy lighting, occupancy and daylight linked lighting controls, power and structured voice/data cabling to desk management systems, atrium display lighting, access control systems and fire alarm and detection systems.
Project Construction Value: £3.5 Million
Completion: 2006