Client: |
Bishop Grosseteste University |
End User: |
Bishop Grosseteste University |
Project Description: |
Two storey extension to existing library with an open double height entrance and single storey student support facility. The library extension will house book stacks, seminar rooms, study area, IT suite and library staff accommodation. The toilet facilities within the existing library are also being refurbished. |
Services Provided by ESDP: |
Full design specification and drawings for Electrical and Mechanical services to the new building. |
Design Features: |
Heating provided by air source heat pump, wind catcher natural ventilation to main book stacks, rainwater harvesting, low energy lighting, photovoltaic power supply system, project/mirror lighting to double height entrance |
Project Construction Value: |
£1.95m |
Completion: |
2012 |